I AMesbury 2030
It’s our pleasure to present the I AMesbury 2030 Master Plan (pronounced I Am Amesbury). Our Task Force has spent the last few years determining the elements of this plan, conducting research and community engagement including summits and surveys, listening session and pop-up events, and working with representatives from our departments, boards, and commissions to explore implementation.
The plan has officially been submitted to the Planning Board for their approval at the upcoming April 29, 2024, meeting. Once accepted, it will be utilized as a guide for city department heads and staff in their daily operations, budget planning, and long and short-term capital plans.
Update 4/29: The I AMesbury 2030 task force presented the Master Plan to the Planning Board at their 4/29 meeting. The Planning Board is reviewing the document and will vote to accept it at a later date.
View the Planning Board meeting.
Mayor Gove created the I AMesbury 2030 task force to help our community plan for the future. This group is gathering community feedback, looking at our strengths and weaknesses and helping to determine where we collectively want Amesbury to be in the next 10 years.
I AMesbury 2030 is looking at every aspect of our community to make sure that we're moving forward with one vision. They are looking at 8 Elements: open space and recreation, learning and education, arts and culture, mobility, infrastructure, economic development, housing, and municipal operations. They are looking at all of these elements with three lenses top of mind: equity, health, and resilience / sustainability. These three key areas are an important consideration to incorporate into every aspect of the 2030 plan.
"I call Amesbury the City of Innovators, and I want us to carry this tradition forward with I AMesbury 2030. I want us to think outside the box about our future, I want us to be ready to pivot and adjust no matter what comes our way, and I want our community to be strong, cohesive and resilient." - Mayor Kassandra Gove
Taskforce Members Mary Chatigny, Co-Chair Brittany Steingesser, Co-Chair Peter Frey Peggy Green Ann McKay Jonathan Miller Michael Woo
City Representatives Kassandra Gove, Mayor William Donohue, Communications Director Nick Cracknell, Director of Community and Economic Development
Current Progress
PROJECT TIMELINE Dec 9, 2020 Task Force Appointed
Jan 13, 2021 Listening Sessions - Amesbury's Identity
May 25, 2021 Determine Elements and timeline for discovery in the 2030 process
Jun 1, 2021 Begin Recreation Element
Aug 3, 2021 Launched Community Survey: Open Space & Recreation
Sep 1, 2021 Begin Learning Element
Oct 31, 2021 Complete Learning Element
Nov 1, 2021 Begin Arts & Culture Element
Dec 31, 2021 Complete Arts & Culture Element
Jan 1, 2022 Begin Mobility Element
Jul 1, 2022 Complete Mobility Element
Jul 1, 2022 Begin Economic Development Element
Oct 1, 2022 Begin Infrastructure Element
Nov 30, 2022 Complete Economic Development Element
Dec 7, 2022 Begin Housing Element
Dec 31, 2022 Complete Operations Element
May 31, 2023 Complete Housing Element
Nov 1, 2023 Finalize I AMesbury 2030 Plan
March 2023 Release I AMesbury 2030 Plan to the community (subject to change)
PROJECT UPDATES Jan 13, 2021 Hold Listening Sessions on January 13, January 15 and January 16 for residents, business owners and stakeholders about Amesbury's Identity. Roughly 40 residents participated in these sessions. Link to Amesbury Listens under Supporting Documents to learn more.
Mar 1, 2021 Launch the I AMesbury 2030 Community Survey to gather additional feedback about priorities and concerns, closes end of March.
May 14, 2021 Hold Amesbury Listens session with PACT / youth to hear from them about Amesbury's Identity
Jun 11, 2021 Hold Amesbury Listens Session with business owners to hear from them about Amesbury's identity
Jul 10, 2021 Hold Open Space & Recreation Summit with organizations and leagues who use our fields, trails, waterways and more.
Aug 31, 2021 Complete Recreation Element
Sep 16, 2021 Conducted the Recreation and Open Space Element Goals and Actions Workshop with municipal department leaders
Sep 23, 2021 Hold pop-up pickleball event at Amesbury Health Fair & Expo
Oct 6, 2021 Hold virtual listening session about learning & education focused on adult learning opportunities.
Oct 7, 2021 Hold virtual listening session about learning and education focused on opportunities for youth / students outside of a school setting.
Nov 12, 2021 Launched Community Survey: Learning and Education
Dec 1, 2021 Conducted an Arts and Culture Summit with municipal staff, committees, organizations and cultural partners
Feb 3, 2022 Release of Recreation Element Progress Report
Feb 16, 2022 Conducted the Learning Element Goals and Actions Workshop with municipal and community stakeholders
Feb 18, 2022 Conducted the Arts and Culture Element Goals and Actions Workshop with municipal and community stakeholders
Feb 28, 2022 Launch of 2030 Mobility Challenge
May 21, 2022 Attended Bike Safety Day on May 21st.
Jul 7, 2022 Conducted the Mobility Element Goals and Actions Workshop with municipal and community stakeholders
Jul 18, 2022 Released the Arts and Culture Element Progress Report
Jul 21, 2022 Released the Learning and Education Element Progress Report
Aug 9, 2022 Organized the Amesbury Economic Development Summit from 9am-12pm.
Sep 17, 2022 Participated in Amesbury Health Fair
Nov 14, 2022 Conducted the Economic Development Goals and Actions Workshop with community stakeholders
Dec 13, 2022 Launched the Infrastructure Survey
Mar 29, 2023 I AMesbury 2030 hosts the Housing Summit
Dec 4, 2023 Released Economic Development Progress Report
Dec 18, 2023 Released Housing Progress Report
March 08, 2024 Released Housing Progress Report
March 25, 2024 Released Infrastructure Progress Report
[{"WidgetSkinID":43,"ComponentType":9,"FontFamily":"Oswald","FontVariant":"regular","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"#fff","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"background-color: #0e2843;\nletter-spacing: 3px;\nposition: relative;\ntransition: all .3s ease-in-out;\ntext-transform: uppercase; \ndisplay: table;\nmargin: 0 auto;\nmargin-top: 1em;\nborder-radius: 5px;\nbox-shadow: 0px 3px 6px rgba(0, 0, 0, 0.16);\n\n}\n\n.widget.skin43 .widgetViewAll::after {\nposition: absolute;\ncontent: '';\ntop: 0;\nbottom: 0;\nz-index: 1;\nheight: 100%;\nwidth: 100%;\nbackground: url(/ImageRepository/Document?documentID=66) left 4.5em center no-repeat;\nbackground-size: 7px;\ntransition: all .3s ease-in-out;\n}\n\n.widget.skin43 .widgetViewAll:hover::after,\n.widget.skin43 .widgetViewAll:focus::after,\n.widget.skin43 .widgetViewAll:active::after {\nbackground: url(/ImageRepository/Document?documentID=70) left 1.5em center no-repeat;\nbackground-size: 40px;\n","LinkVisitedColor":"#fff","LinkVisitedMiscellaneousStyles":"background-color: #0e2843;","LinkHoverColor":"","LinkHoverUnderlined":true,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWidth":0,"SelectedBorderColor":"","SelectedBorderSides":15,"SelectedBorderRadiusTopLeft":{"Value":null,"Unit":1},"SelectedBorderRadiusTopRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomLeft":{"Value":null,"Unit":1},"HoverFontFamily":"","HoverFontVariant":"","HoverFontColor":"","HoverFontSize":0.00,"HoverFontStyle":0,"HoverTextAlignment":0,"HoverShadowColor":"","HoverShadowBlurRadius":0,"HoverShadowSpreadRadius":0,"HoverShadowOffsetX":0,"HoverShadowOffsetY":0,"HoverShadowInset":false,"HoverShadowColor2":"","HoverShadowBlurRadius2":0,"HoverShadowSpreadRadius2":0,"HoverShadowOffsetX2":0,"HoverShadowOffsetY2":0,"HoverShadowInset2":false,"HoverShadowColor3":"","HoverShadowBlurRadius3":0,"HoverShadowSpreadRadius3":0,"HoverShadowOffsetX3":0,"HoverShadowOffsetY3":0,"HoverShadowInset3":false,"HoverShadowColor4":"","HoverShadowBlurRadius4":0,"HoverShadowSpreadRadius4":0,"HoverShadowOffsetX4":0,"HoverShadowOffsetY4":0,"HoverShadowInset4":false,"HoverShadowColor5":"","HoverShadowBlurRadius5":0,"HoverShadowSpreadRadius5":0,"HoverShadowOffsetX5":0,"HoverShadowOffsetY5":0,"HoverShadowInset5":false,"HoverCapitalization":0,"SelectedFontFamily":"","SelectedFontVariant":"","SelectedFontColor":"","SelectedFontSize":0.00,"SelectedFontStyle":0,"SelectedShadowColor":"","SelectedShadowBlurRadius":0,"SelectedShadowSpreadRadius":0,"SelectedShadowOffsetX":0,"SelectedShadowOffsetY":0,"SelectedShadowInset":false,"SpaceBetweenTabs":0,"SpaceBetweenTabsUnits":"","Trigger":1,"AnimationId":"4e03dea8-0dab-462d-8ac4-23a03ddeff38","AnimationClass":"animation4e03dea80dab462d8ac423a03ddeff38","ScrollOffset":33,"TriggerNameLowerCase":"hover","ParentComponentWithTrigger":null,"BackgroundColor":"","BackgroundGradientStartingColor":"","BackgroundGradientEndingColor":"","BackgroundGradientDirection":0,"BackgroundGradientDegrees":0.0000000,"BackgroundImageFileName":"","BackgroundImagePositionXUseKeyword":true,"BackgroundImagePositionXKeyword":0,"BackgroundImagePositionX":{"Value":0.0000,"Unit":0},"BackgroundImagePositionYUseKeyword":true,"BackgroundImagePositionYKeyword":0,"BackgroundImagePositionY":{"Value":0.0000,"Unit":0},"BackgroundImageRepeat":0,"BorderStyle":0,"BorderWidth":0,"BorderColor":"","BorderSides":15,"BorderRadiusTopLeft":{"Value":null,"Unit":1},"BorderRadiusTopRight":{"Value":null,"Unit":1},"BorderRadiusBottomRight":{"Value":null,"Unit":1},"BorderRadiusBottomLeft":{"Value":null,"Unit":1},"MarginTop":{"Value":1.0000,"Unit":0},"MarginRight":{"Value":null,"Unit":0},"MarginBottom":{"Value":null,"Unit":0},"MarginLeft":{"Value":null,"Unit":0},"PaddingTop":{"Value":0.7500,"Unit":0},"PaddingRight":{"Value":6.0000,"Unit":0},"PaddingBottom":{"Value":0.7500,"Unit":0},"PaddingLeft":{"Value":6.0000,"Unit":0},"MiscellaneousStyles":"","RecordStatus":0},{"WidgetSkinID":59,"ComponentType":3,"FontFamily":"","FontVariant":"","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"","LinkVisitedColor":"","LinkVisitedMiscellaneousStyles":"","LinkHoverColor":"","LinkHoverUnderlined":false,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWidth":0,"SelectedBorderColor":"","SelectedBorderSides":15,"SelectedBorderRadiusTopLeft":{"Value":null,"Unit":1},"SelectedBorderRadiusTopRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomLeft":{"Value":null,"Unit":1},"HoverFontFamily":"","HoverFontVariant":"","HoverFontColor":"","HoverFontSize":0.00,"HoverFontStyle":0,"HoverTextAlignment":0,"HoverShadowColor":"","HoverShadowBlurRadius":0,"HoverShadowSpreadRadius":0,"HoverShadowOffsetX":0,"HoverShadowOffsetY":0,"HoverShadowInset":false,"HoverShadowColor2":"","HoverShadowBlurRadius2":0,"HoverShadowSpreadRadius2":0,"HoverShadowOffsetX2":0,"HoverShadowOffsetY2":0,"HoverShadowInset2":false,"HoverShadowColor3":"","HoverShadowBlurRadius3":0,"HoverShadowSpreadRadius3":0,"HoverShadowOffsetX3":0,"HoverShadowOffsetY3":0,"HoverShadowInset3":false,"HoverShadowColor4":"","HoverShadowBlurRadius4":0,"HoverShadowSpreadRadius4":0,"HoverShadowOffsetX4":0,"HoverShadowOffsetY4":0,"HoverShadowInset4":false,"HoverShadowColor5":"","HoverShadowBlurRadius5":0,"HoverShadowSpreadRadius5":0,"HoverShadowOffsetX5":0,"HoverShadowOffsetY5":0,"HoverShadowInset5":false,"HoverCapitalization":0,"SelectedFontFamily":"","SelectedFontVariant":"","SelectedFontColor":"","SelectedFontSize":0.00,"SelectedFontStyle":0,"SelectedShadowColor":"","SelectedShadowBlurRadius":0,"SelectedShadowSpreadRadius":0,"SelectedShadowOffsetX":0,"SelectedShadowOffsetY":0,"SelectedShadowInset":false,"SpaceBetweenTabs":0,"SpaceBetweenTabsUnits":"","Trigger":4,"AnimationId":"a2285d72-065d-491c-96e5-1cdc1194f291","AnimationClass":"animationa2285d72065d491c96e51cdc1194f291","ScrollOffset":33,"TriggerNameLowerCase":"scroll","ParentComponentWithTrigger":null,"BackgroundColor":"","BackgroundGradientStartingColor":"","BackgroundGradientEndingColor":"","BackgroundGradientDirection":0,"BackgroundGradientDegrees":0.0000000,"BackgroundImageFileName":"","BackgroundImagePositionXUseKeyword":true,"BackgroundImagePositionXKeyword":0,"BackgroundImagePositionX":{"Value":0.0,"Unit":0},"BackgroundImagePositionYUseKeyword":true,"BackgroundImagePositionYKeyword":0,"BackgroundImagePositionY":{"Value":0.0,"Unit":0},"BackgroundImageRepeat":0,"BorderStyle":0,"BorderWidth":0,"BorderColor":"","BorderSides":15,"BorderRadiusTopLeft":{"Value":null,"Unit":1},"BorderRadiusTopRight":{"Value":null,"Unit":1},"BorderRadiusBottomRight":{"Value":null,"Unit":1},"BorderRadiusBottomLeft":{"Value":null,"Unit":1},"MarginTop":{"Value":null,"Unit":0},"MarginRight":{"Value":null,"Unit":0},"MarginBottom":{"Value":null,"Unit":0},"MarginLeft":{"Value":null,"Unit":0},"PaddingTop":{"Value":0.5000,"Unit":0},"PaddingRight":{"Value":null,"Unit":0},"PaddingBottom":{"Value":1.0000,"Unit":0},"PaddingLeft":{"Value":null,"Unit":0},"MiscellaneousStyles":"margin: .5em;","RecordStatus":0},{"WidgetSkinID":57,"ComponentType":9,"FontFamily":"Oswald","FontVariant":"regular","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"#fff","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"background-color: #0e2843;\nletter-spacing: 3px;\nposition: relative;\ntransition: all .3s ease-in-out; \ntext-transform: uppercase; \ndisplay: table;\nmargin: 0 auto;\nmargin-top: 1em;\nborder-radius: 5px;\nbox-shadow: 0px 3px 6px rgba(0, 0, 0, 0.16);\n\n}\n\n.widget.skin57 .widgetViewAll::after {\nposition: absolute;\ncontent: '';\ntop: 0;\nbottom: 0;\nz-index: 1;\nheight: 100%;\nwidth: 100%;\nbackground: url(/ImageRepository/Document?documentID=66) left 4.5em center no-repeat;\nbackground-size: 7px;\ntransition: all .3s ease-in-out;\n}\n\n.widget.skin57 .widgetViewAll:hover::after,\n.widget.skin57 .widgetViewAll:focus::after,\n.widget.skin57 .widgetViewAll:active::after {\nbackground: url(/ImageRepository/Document?documentID=70) left 1.5em center no-repeat;\nbackground-size: 40px;\n","LinkVisitedColor":"#fff","LinkVisitedMiscellaneousStyles":"background-color: #0e2843;","LinkHoverColor":"","LinkHoverUnderlined":true,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWidth":0,"SelectedBorderColor":"","SelectedBorderSides":15,"SelectedBorderRadiusTopLeft":{"Value":null,"Unit":1},"SelectedBorderRadiusTopRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomLeft":{"Value":null,"Unit":1},"HoverFontFamily":"","HoverFontVariant":"","HoverFontColor":"","HoverFontSize":0.00,"HoverFontStyle":0,"HoverTextAlignment":0,"HoverShadowColor":"","HoverShadowBlurRadius":0,"HoverShadowSpreadRadius":0,"HoverShadowOffsetX":0,"HoverShadowOffsetY":0,"HoverShadowInset":false,"HoverShadowColor2":"","HoverShadowBlurRadius2":0,"HoverShadowSpreadRadius2":0,"HoverShadowOffsetX2":0,"HoverShadowOffsetY2":0,"HoverShadowInset2":false,"HoverShadowColor3":"","HoverShadowBlurRadius3":0,"HoverShadowSpreadRadius3":0,"HoverShadowOffsetX3":0,"HoverShadowOffsetY3":0,"HoverShadowInset3":false,"HoverShadowColor4":"","HoverShadowBlurRadius4":0,"HoverShadowSpreadRadius4":0,"HoverShadowOffsetX4":0,"HoverShadowOffsetY4":0,"HoverShadowInset4":false,"HoverShadowColor5":"","HoverShadowBlurRadius5":0,"HoverShadowSpreadRadius5":0,"HoverShadowOffsetX5":0,"HoverShadowOffsetY5":0,"HoverShadowInset5":false,"HoverCapitalization":0,"SelectedFontFamily":"","SelectedFontVariant":"","SelectedFontColor":"","SelectedFontSize":0.00,"SelectedFontStyle":0,"SelectedShadowColor":"","SelectedShadowBlurRadius":0,"SelectedShadowSpreadRadius":0,"SelectedShadowOffsetX":0,"SelectedShadowOffsetY":0,"SelectedShadowInset":false,"SpaceBetweenTabs":0,"SpaceBetweenTabsUnits":"","Trigger":1,"AnimationId":"4e03dea8-0dab-462d-8ac4-23a03ddeff38","AnimationClass":"animation4e03dea80dab462d8ac423a03ddeff38","ScrollOffset":33,"TriggerNameLowerCase":"hover","ParentComponentWithTrigger":null,"BackgroundColor":"","BackgroundGradientStartingColor":"","BackgroundGradientEndingColor":"","BackgroundGradientDirection":0,"BackgroundGradientDegrees":0.0000000,"BackgroundImageFileName":"","BackgroundImagePositionXUseKeyword":true,"BackgroundImagePositionXKeyword":0,"BackgroundImagePositionX":{"Value":0.0000,"Unit":0},"BackgroundImagePositionYUseKeyword":true,"BackgroundImagePositionYKeyword":0,"BackgroundImagePositionY":{"Value":0.0000,"Unit":0},"BackgroundImageRepeat":0,"BorderStyle":0,"BorderWidth":0,"BorderColor":"","BorderSides":15,"BorderRadiusTopLeft":{"Value":null,"Unit":1},"BorderRadiusTopRight":{"Value":null,"Unit":1},"BorderRadiusBottomRight":{"Value":null,"Unit":1},"BorderRadiusBottomLeft":{"Value":null,"Unit":1},"MarginTop":{"Value":1.0000,"Unit":0},"MarginRight":{"Value":null,"Unit":0},"MarginBottom":{"Value":null,"Unit":0},"MarginLeft":{"Value":null,"Unit":0},"PaddingTop":{"Value":0.7500,"Unit":0},"PaddingRight":{"Value":6.0000,"Unit":0},"PaddingBottom":{"Value":0.7500,"Unit":0},"PaddingLeft":{"Value":6.0000,"Unit":0},"MiscellaneousStyles":"","RecordStatus":0},{"WidgetSkinID":58,"ComponentType":9,"FontFamily":"Oswald","FontVariant":"regular","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"#fff","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"background-color: #0e2843;\nletter-spacing: 3px;\nposition: relative;\ntransition: all .3s ease-in-out;\ntext-transform: uppercase; \ndisplay: table;\nmargin: 0 auto;\nmargin-top: 1em;\nborder-radius: 5px;\nbox-shadow: 0px 3px 6px rgba(0, 0, 0, 0.16);\n\n}\n\n.widget.skin43 .widgetViewAll::after {\nposition: absolute;\ncontent: '';\ntop: 0;\nbottom: 0;\nz-index: 1;\nheight: 100%;\nwidth: 100%;\nbackground: url(/ImageRepository/Document?documentID=66) left 4.5em center no-repeat;\nbackground-size: 7px;\ntransition: all .3s ease-in-out;\n}\n\n.widget.skin43 .widgetViewAll:hover::after,\n.widget.skin43 .widgetViewAll:focus::after,\n.widget.skin43 .widgetViewAll:active::after {\nbackground: url(/ImageRepository/Document?documentID=70) left 1.5em center no-repeat;\nbackground-size: 40px;\n","LinkVisitedColor":"#fff","LinkVisitedMiscellaneousStyles":"background-color: #0e2843;","LinkHoverColor":"","LinkHoverUnderlined":true,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWidth":0,"SelectedBorderColor":"","SelectedBorderSides":15,"SelectedBorderRadiusTopLeft":{"Value":null,"Unit":1},"SelectedBorderRadiusTopRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomLeft":{"Value":null,"Unit":1},"HoverFontFamily":"","HoverFontVariant":"","HoverFontColor":"","HoverFontSize":0.00,"HoverFontStyle":0,"HoverTextAlignment":0,"HoverShadowColor":"","HoverShadowBlurRadius":0,"HoverShadowSpreadRadius":0,"HoverShadowOffsetX":0,"HoverShadowOffsetY":0,"HoverShadowInset":false,"HoverShadowColor2":"","HoverShadowBlurRadius2":0,"HoverShadowSpreadRadius2":0,"HoverShadowOffsetX2":0,"HoverShadowOffsetY2":0,"HoverShadowInset2":false,"HoverShadowColor3":"","HoverShadowBlurRadius3":0,"HoverShadowSpreadRadius3":0,"HoverShadowOffsetX3":0,"HoverShadowOffsetY3":0,"HoverShadowInset3":false,"HoverShadowColor4":"","HoverShadowBlurRadius4":0,"HoverShadowSpreadRadius4":0,"HoverShadowOffsetX4":0,"HoverShadowOffsetY4":0,"HoverShadowInset4":false,"HoverShadowColor5":"","HoverShadowBlurRadius5":0,"HoverShadowSpreadRadius5":0,"HoverShadowOffsetX5":0,"HoverShadowOffsetY5":0,"HoverShadowInset5":false,"HoverCapitalization":0,"SelectedFontFamily":"","SelectedFontVariant":"","SelectedFontColor":"","SelectedFontSize":0.00,"SelectedFontStyle":0,"SelectedShadowColor":"","SelectedShadowBlurRadius":0,"SelectedShadowSpreadRadius":0,"SelectedShadowOffsetX":0,"SelectedShadowOffsetY":0,"SelectedShadowInset":false,"SpaceBetweenTabs":0,"SpaceBetweenTabsUnits":"","Trigger":1,"AnimationId":"4e03dea8-0dab-462d-8ac4-23a03ddeff38","AnimationClass":"animation4e03dea80dab462d8ac423a03ddeff38","ScrollOffset":33,"TriggerNameLowerCase":"hover","ParentComponentWithTrigger":null,"BackgroundColor":"","BackgroundGradientStartingColor":"","BackgroundGradientEndingColor":"","BackgroundGradientDirection":0,"BackgroundGradientDegrees":0.0000000,"BackgroundImageFileName":"","BackgroundImagePositionXUseKeyword":true,"BackgroundImagePositionXKeyword":0,"BackgroundImagePositionX":{"Value":0.0000,"Unit":0},"BackgroundImagePositionYUseKeyword":true,"BackgroundImagePositionYKeyword":0,"BackgroundImagePositionY":{"Value":0.0000,"Unit":0},"BackgroundImageRepeat":0,"BorderStyle":0,"BorderWidth":0,"BorderColor":"","BorderSides":15,"BorderRadiusTopLeft":{"Value":null,"Unit":1},"BorderRadiusTopRight":{"Value":null,"Unit":1},"BorderRadiusBottomRight":{"Value":null,"Unit":1},"BorderRadiusBottomLeft":{"Value":null,"Unit":1},"MarginTop":{"Value":1.0000,"Unit":0},"MarginRight":{"Value":null,"Unit":0},"MarginBottom":{"Value":null,"Unit":0},"MarginLeft":{"Value":null,"Unit":0},"PaddingTop":{"Value":0.7500,"Unit":0},"PaddingRight":{"Value":6.0000,"Unit":0},"PaddingBottom":{"Value":0.7500,"Unit":0},"PaddingLeft":{"Value":6.0000,"Unit":0},"MiscellaneousStyles":"","RecordStatus":0},{"WidgetSkinID":62,"ComponentType":9,"FontFamily":"Oswald","FontVariant":"regular","FontColor":"","FontSize":0.00,"FontStyle":0,"TextAlignment":0,"ShadowColor":"","ShadowBlurRadius":0,"ShadowSpreadRadius":0,"ShadowOffsetX":0,"ShadowOffsetY":0,"ShadowInset":false,"ShadowColor2":"","ShadowBlurRadius2":0,"ShadowSpreadRadius2":0,"ShadowOffsetX2":0,"ShadowOffsetY2":0,"ShadowInset2":false,"ShadowColor3":"","ShadowBlurRadius3":0,"ShadowSpreadRadius3":0,"ShadowOffsetX3":0,"ShadowOffsetY3":0,"ShadowInset3":false,"ShadowColor4":"","ShadowBlurRadius4":0,"ShadowSpreadRadius4":0,"ShadowOffsetX4":0,"ShadowOffsetY4":0,"ShadowInset4":false,"ShadowColor5":"","ShadowBlurRadius5":0,"ShadowSpreadRadius5":0,"ShadowOffsetX5":0,"ShadowOffsetY5":0,"ShadowInset5":false,"Capitalization":0,"HeaderMiscellaneousStyles1":"","HeaderMiscellaneousStyles2":"","HeaderMiscellaneousStyles3":"","BulletStyle":0,"BulletWidth":2.00,"BulletColor":"","LinkNormalColor":"#fff","LinkNormalUnderlined":false,"LinkNormalMiscellaneousStyles":"background-color: #0e2843;\nletter-spacing: 3px;\nposition: relative;\ntransition: all .3s ease-in-out;\ntext-transform: uppercase; \ndisplay: table;\nmargin: 0 auto;\nmargin-top: 1em;\nborder-radius: 5px;\nbox-shadow: 0px 3px 6px rgba(0, 0, 0, 0.16);\n\n}\n\n.widget.skin43 .widgetViewAll::after {\nposition: absolute;\ncontent: '';\ntop: 0;\nbottom: 0;\nz-index: 1;\nheight: 100%;\nwidth: 100%;\nbackground: url(/ImageRepository/Document?documentID=66) left 4.5em center no-repeat;\nbackground-size: 7px;\ntransition: all .3s ease-in-out;\n}\n\n.widget.skin43 .widgetViewAll:hover::after,\n.widget.skin43 .widgetViewAll:focus::after,\n.widget.skin43 .widgetViewAll:active::after {\nbackground: url(/ImageRepository/Document?documentID=70) left 1.5em center no-repeat;\nbackground-size: 40px;\n","LinkVisitedColor":"#fff","LinkVisitedMiscellaneousStyles":"background-color: #0e2843;","LinkHoverColor":"","LinkHoverUnderlined":true,"LinkHoverMiscellaneousStyles":"","LinkSelectedUnderlined":false,"ForceReadOnLinkToNewLine":false,"DisplayColumnSeparator":false,"ColumnSeparatorWidth":0.0000,"HoverBackgroundColor":"","HoverBackgroundGradientStartingColor":"","HoverBackgroundGradientEndingColor":"","HoverBackgroundGradientDirection":0,"HoverBackgroundGradientDegrees":0.0000000,"HoverBackgroundImageFileName":"","HoverBackgroundImagePositionXUseKeyword":true,"HoverBackgroundImagePositionXKeyword":0,"HoverBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"HoverBackgroundImagePositionYUseKeyword":true,"HoverBackgroundImagePositionYKeyword":0,"HoverBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"HoverBackgroundImageRepeat":0,"HoverBorderStyle":0,"HoverBorderWidth":0,"HoverBorderColor":"","HoverBorderSides":15,"HoverBorderRadiusTopLeft":{"Value":null,"Unit":1},"HoverBorderRadiusTopRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomRight":{"Value":null,"Unit":1},"HoverBorderRadiusBottomLeft":{"Value":null,"Unit":1},"SelectedBackgroundColor":"","SelectedBackgroundGradientStartingColor":"","SelectedBackgroundGradientEndingColor":"","SelectedBackgroundGradientDirection":0,"SelectedBackgroundGradientDegrees":0.0000000,"SelectedBackgroundImageFileName":"","SelectedBackgroundImagePositionXUseKeyword":true,"SelectedBackgroundImagePositionXKeyword":0,"SelectedBackgroundImagePositionX":{"Value":0.0000,"Unit":0},"SelectedBackgroundImagePositionYUseKeyword":true,"SelectedBackgroundImagePositionYKeyword":0,"SelectedBackgroundImagePositionY":{"Value":0.0000,"Unit":0},"SelectedBackgroundImageRepeat":0,"SelectedBorderStyle":0,"SelectedBorderWidth":0,"SelectedBorderColor":"","SelectedBorderSides":15,"SelectedBorderRadiusTopLeft":{"Value":null,"Unit":1},"SelectedBorderRadiusTopRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomRight":{"Value":null,"Unit":1},"SelectedBorderRadiusBottomLeft":{"Value":null,"Unit":1},"HoverFontFamily":"","HoverFontVariant":"","HoverFontColor":"","HoverFontSize":0.00,"HoverFontStyle":0,"HoverTextAlignment":0,"HoverShadowColor":"","HoverShadowBlurRadius":0,"HoverShadowSpreadRadius":0,"HoverShadowOffsetX":0,"HoverShadowOffsetY":0,"HoverShadowInset":false,"HoverShadowColor2":"","HoverShadowBlurRadius2":0,"HoverShadowSpreadRadius2":0,"HoverShadowOffsetX2":0,"HoverShadowOffsetY2":0,"HoverShadowInset2":false,"HoverShadowColor3":"","HoverShadowBlurRadius3":0,"HoverShadowSpreadRadius3":0,"HoverShadowOffsetX3":0,"HoverShadowOffsetY3":0,"HoverShadowInset3":false,"HoverShadowColor4":"","HoverShadowBlurRadius4":0,"HoverShadowSpreadRadius4":0,"HoverShadowOffsetX4":0,"HoverShadowOffsetY4":0,"HoverShadowInset4":false,"HoverShadowColor5":"","HoverShadowBlurRadius5":0,"HoverShadowSpreadRadius5":0,"HoverShadowOffsetX5":0,"HoverShadowOffsetY5":0,"HoverShadowInset5":false,"HoverCapitalization":0,"SelectedFontFamily":"","SelectedFontVariant":"","SelectedFontColor":"","SelectedFontSize":0.00,"SelectedFontStyle":0,"SelectedShadowColor":"","SelectedShadowBlurRadius":0,"SelectedShadowSpreadRadius":0,"SelectedShadowOffsetX":0,"SelectedShadowOffsetY":0,"SelectedShadowInset":false,"SpaceBetweenTabs":0,"SpaceBetweenTabsUnits":"","Trigger":1,"AnimationId":"4e03dea8-0dab-462d-8ac4-23a03ddeff38","AnimationClass":"animation4e03dea80dab462d8ac423a03ddeff38","ScrollOffset":33,"TriggerNameLowerCase":"hover","ParentComponentWithTrigger":null,"BackgroundColor":"","BackgroundGradientStartingColor":"","BackgroundGradientEndingColor":"","BackgroundGradientDirection":0,"BackgroundGradientDegrees":0.0000000,"BackgroundImageFileName":"","BackgroundImagePositionXUseKeyword":true,"BackgroundImagePositionXKeyword":0,"BackgroundImagePositionX":{"Value":0.0000,"Unit":0},"BackgroundImagePositionYUseKeyword":true,"BackgroundImagePositionYKeyword":0,"BackgroundImagePositionY":{"Value":0.0000,"Unit":0},"BackgroundImageRepeat":0,"BorderStyle":0,"BorderWidth":0,"BorderColor":"","BorderSides":15,"BorderRadiusTopLeft":{"Value":null,"Unit":1},"BorderRadiusTopRight":{"Value":null,"Unit":1},"BorderRadiusBottomRight":{"Value":null,"Unit":1},"BorderRadiusBottomLeft":{"Value":null,"Unit":1},"MarginTop":{"Value":1.0000,"Unit":0},"MarginRight":{"Value":null,"Unit":0},"MarginBottom":{"Value":null,"Unit":0},"MarginLeft":{"Value":null,"Unit":0},"PaddingTop":{"Value":0.7500,"Unit":0},"PaddingRight":{"Value":6.0000,"Unit":0},"PaddingBottom":{"Value":0.7500,"Unit":0},"PaddingLeft":{"Value":6.0000,"Unit":0},"MiscellaneousStyles":"","RecordStatus":0}]